Pak E&E Solutions

Projects

Our Projects

TESTING/COMMISSIONING OF ELECTRICAL SYSTEM INSTALLED AT SUKKUR-MULTAN MOTORWAY PROJECT

Client  : CSCEC-NHA
Location  : Office Complex Building NHA, Shershah/Multan
Year  : 2021
Consultant  : JV of SMEC, NDC, ECSP, ACE, INDUS & TRS
Scope   : Testing & Commissioning of Electrical System.

Details:
Pak E&E Solution has provided services to the main Contractor CSCEC for testing and Commissioning of Electrical system installed at Service Areas, Rest Areas and Toll Plazas. Electrical system includes Power Transformers(Earthing), Diesel Generators (Load, Sound, Vibrations, Earthing), Building Lighting (Lux) Calculations, Insulation resistance test of Power cables, Earth resistivity of all Electrical Panels and DBs.

Neelum Jhelum Hydro Power Project-Underground Powerhouse (C3)

Client  : CGGC-CMEC & WAPDA
Location  : Muzaffarabad-Kashmir
Year  : 2017-2018
Consultant  : JV NESPAK, ACE, NDC, MWH & NORPLAN
Scope   : Electrical Cable laying and terminations

Details:
Neelum Jhelum Hydro Power Project is an Engineering marvel which mainly comprised of underground 969MW Powerhouse, 525KV Switchyard, Control Building and WAPDA residential colony etc. Pak E&E Solution has provided services to the main Contractor CGGC-CMEC for cable laying and terminations across the project site-C3.

ZTE-TELENOR MS PROJECT (C1-B)

Client  : ELC-ZTE-TELENOR
Location  : C1-B Region
Year  : 2014-2015
Scope   : Preventive, Corrective Maintenance and Overhauling of Diesel Generators.     Handling of Commercial Power (WAPDA) issues.

Details:
ZTE-Telenor MS Project (C1-B) consist of Managing all services of Telenor sites located in Sahiwal, Okara, Depalpur, Kasur, Pattoki. Pak E&E Solution has provided services as sub-contractor of ELC corporation to handle PM & CM of Electrical system, Diesel generators along with commercial power (WAPDA) issues.

HUAWEI-UFONE MS PROJECT (C1-A)

Client  : EXTREME-HUAWEI-UFONE
Location  : C1-A Region
Year  : 2012-2015
Scope   : Preventive, Corrective Maintenance and Overhauling of Diesel Generators. Handling of Commercial Power (WAPDA) issues.

Details:
HUAWEI-UFONE MS Project (C1-A) consist of Managing all services of Ufone sites located in Lahore, Kasur, Pattoki, Sheikhupura, Gujranwala, Gujrat, Sialkot, Hafizabad. Pak E&E Solution has provided services as sub-contractor of Extreme engineering solutions to handle PM & CM of Electrical system, Diesel generators along with commercial power (WAPDA) issues.

INSTALLATION & TESTING/COMMISSIONING OF POWER TRANSFORMERS, DIESEL GENERATORS, LT PANELS, CABLE LAYING AND TERMINATION, ROAD LIGHTS INSTALLATION

Client  : CSCEC-NHA
Location  : Sukkur-Multan Motorway Project M-5
Year  : 2019-2022
Scope   : Installation and Testing/Commissioning of Electrical System

Details:
Pak E&E Solution has provided services to the main Contractor CSCEC for installation of Power Transformers, Diesel Generators, LT Panels, Cable Laying/Termination and Road lights at Sukkur-Multan Motorway Project-M5 Service Areas(12), Rest Areas (10) and Toll Plazas (22).

REPARIRING SERVICES FOR DAMAGED TESTING EQUIPMENT

Client  : CGGC-GMEC
Location  : Sukhi Kinari Hydro Power Project
Year  : 2019
Scope   : Repairing services for Damaged Testing equipment.

Details:
Pak E&E Solution has provided services to CGGC-GMEC (Chinese contractor companies) for Repairing of Electrical Power Testing equipment which was damaged during transportation from China to Pakistan. Testing equipment includes Excitation transformer, Fixed reactor (600kva), HV Adjustable Reactor (600kva). All these equipment repaired and handed over to the client after successful factory testing.

Trust and Worth

Our Clients